[{"data":1,"prerenderedAt":125},["ShallowReactive",2],{"caseStudy:commercial-roof-replacement-in-braintree-essex":3},{"id":4,"job_description":5,"location":6,"publish_state":7,"spotlight":8,"title":9,"seo_title":9,"seo_meta_description":10,"slug":11,"og_image_id":12,"main_image_id":13,"main_video_id":14,"summary":15,"work_started_at":16,"work_completed_at":17,"customer_id":14,"enquiry_id":14,"deleted_at":14,"created_at":18,"updated_at":19,"customer":14,"enquiry":14,"main_image":20,"main_video":14,"media_files":27,"og_image":87,"services":91},"01m3bmyx2fj1v3d3f1cqj00cjq","\u003Cp dir=\"ltr\">Cambridge Roof Exchange was appointed by CRS Technics Ltd to safely remove an ageing asbestos roof and install a brand new composite roofing system on their industrial building in Braintree, Essex.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The existing roof was made of Double 6 asbestos cement sheets over plasterboard liners, with very little insulation. It had reached the end of its serviceable life, and the original asbestos cement gutters were too small for the roof they served. That meant a full strip-out and replacement was needed rather than a refurbishment.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Our team safely removed and disposed of almost 2,000m&sup2; of asbestos roofing in line with current regulations. We then installed a new 130mm insulated composite roofing system designed to improve the building's thermal efficiency, weather resistance and overall appearance. As well as delivering the works as Principal Contractor, we also produced the roof design drawings.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">This approach gave CRS Technics a safe, fully compliant and high-performing new roof. It's a practical route for other commercial and industrial property owners in Braintree and across Essex who are dealing with ageing asbestos roofs.\u003C\u002Fp>\n\u003Cdiv dir=\"ltr\">\n\u003Ctable>\n\u003Cthead>\n\u003Ctr>\n\u003Cth scope=\"col\">Project detail\u003C\u002Fth>\n\u003Cth scope=\"col\">Scope\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003C\u002Fthead>\n\u003Ctbody>\n\u003Ctr>\n\u003Ctd>Client\u003C\u002Ftd>\n\u003Ctd>CRS Technics Ltd\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Location\u003C\u002Ftd>\n\u003Ctd>Braintree, Essex\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Building\u003C\u002Ftd>\n\u003Ctd>Steel-framed industrial unit, about 50m &times; 30m, 7m to eaves\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Project type\u003C\u002Ftd>\n\u003Ctd>Asbestos roof removal and replacement\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Roof area\u003C\u002Ftd>\n\u003Ctd>Almost 2,000m&sup2;\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Existing roof\u003C\u002Ftd>\n\u003Ctd>Double 6 asbestos cement sheets with minimal insulation\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>New roof\u003C\u002Ftd>\n\u003Ctd>Joris Ide 130mm PIR composite panels, Colorcoat HPS200 Ultra finish\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Roof U-value\u003C\u002Ftd>\n\u003Ctd>0.16 W\u002Fm&sup2;K\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Rooflights\u003C\u002Ftd>\n\u003Ctd>90m of triple-skin GRP rooflights\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Gutters\u003C\u002Ftd>\n\u003Ctd>198m of new bespoke composite gutters\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Warranty\u003C\u002Ftd>\n\u003Ctd>40-year warranty\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003C\u002Fdiv>\n\u003Cp dir=\"ltr\">\u003Cstrong>Asbestos Removal\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The project began with the safe removal of the existing asbestos roof. Before any sheets were lifted, around 2,000m&sup2; of safety netting was installed beneath the roof. A perimeter scaffold, a stair tower for safe access and 190m of edge protection were also put in place.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Trained operatives then removed the asbestos sheets and gutters under strict non-licensed asbestos procedures. Asbestos air monitoring was carried out at the start and end of the works. All asbestos waste was double-wrapped and placed in enclosed containers for safe, licensed disposal, with a single load alone accounting for almost 13 tonnes of asbestos sheeting. Non-hazardous materials, including metal and plasterboard, were separated for recycling.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Asbestos cement roofs like this are common on older industrial units. Our guide to \u003Ca href=\"..\u002F..\u002F..\u002Farticles\u002Fasbestos-roofs-on-pre-2000-industrial-buildings\">asbestos roofs on pre-2000 industrial buildings\u003C\u002Fa> explains what property owners need to know.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Removing the asbestos roof cleared the way for a completely new, modern roofing system to be installed.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>New Roof Installation\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">With the asbestos roof removed, a new composite roofing system was installed. The new roof works included:\u003C\u002Fp>\n\u003Cul dir=\"ltr\">\n\u003Cli>Joris Ide JI 1000\u002F333 composite roof panels with a 130mm PIR insulated core\u003C\u002Fli>\n\u003Cli>A Colorcoat HPS200 Ultra coated finish in Goosewing Grey\u003C\u002Fli>\n\u003Cli>90m of new triple-skin GRP rooflights\u003C\u002Fli>\n\u003Cli>198m of new bespoke composite gutters with new uPVC downpipes\u003C\u002Fli>\n\u003Cli>New associated flashings and finishing details\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp dir=\"ltr\">Together, these works created a brand new protective building envelope that significantly upgraded the condition and performance of the roof compared with the original asbestos structure. We used the same composite system on our \u003Ca href=\"..\u002F..\u002F..\u002Fcase-studies\u002Froof-refurbishment-and-solar-in-bury-st-edmunds\">roof refurbishment and solar project in Bury St Edmunds\u003C\u002Fa>.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>Improved Thermal Performance\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Improving thermal efficiency was a key objective of the project. The 130mm PIR insulated core gives the new roof a U-value of 0.16 W\u002Fm&sup2;K, a major improvement on the old asbestos sheets, which had only minimal fibreglass insulation beneath them.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">For commercial and industrial buildings, replacing an old asbestos roof delivers benefits that go beyond weather protection and compliance. Better insulation can help reduce energy consumption, improve internal working temperatures and \u003Ca href=\"..\u002F..\u002F..\u002Farticles\u002Fhow-your-roof-can-improve-a-commercial-epc-rating\">strengthen a building's EPC rating\u003C\u002Fa>. EPC performance is an increasingly important factor for commercial landlords and occupiers.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>New Rooflights for Improved Daylighting\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">90m of new Brett Martin triple-skin GRP rooflights were installed as part of the new roof, increasing the amount of natural daylight entering the building.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The rooflights were fully integrated into the new composite roofing system, giving a secure, weather-resistant finish. Their triple-skin construction gives better thermal performance than standard single-skin rooflights. They help create a brighter working environment while reducing reliance on artificial lighting during the day.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>Gutter Upgrades for Long-Term Protection\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The original asbestos cement gutters were undersized for the roof. We replaced them with 198m of new bespoke composite gutters and new uPVC downpipes to improve rainwater management and protect against future water ingress.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Commercial gutters are particularly vulnerable to deterioration over time. Dealing with them alongside the roof replacement delivers a more complete, long-term roofing solution rather than storing up problems for the future.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>Long-Term Protection: 40-Year Warranty\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">On completion, the new roofing system was backed by a 40-year warranty, giving CRS Technics long-term reassurance and confidence in the performance of their new roof.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>The Result\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The finished project delivered:\u003C\u002Fp>\n\u003Cul dir=\"ltr\">\n\u003Cli>Safe removal of almost 2,000m&sup2; of asbestos cement roofing\u003C\u002Fli>\n\u003Cli>A new 130mm insulated composite roof achieving a U-value of 0.16 W\u002Fm&sup2;K\u003C\u002Fli>\n\u003Cli>90m of new triple-skin rooflights for better natural daylight\u003C\u002Fli>\n\u003Cli>198m of new bespoke composite gutters\u003C\u002Fli>\n\u003Cli>A 40-year warranty for long-term peace of mind\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp dir=\"ltr\">The project safely removed a hazardous, ageing asbestos roof from CRS Technics' building and replaced it with a modern, insulated, weather-resistant roofing system. It transformed both the safety and the performance of the building and secured its long-term future.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>Dealing With an Asbestos Roof in Essex?\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">For commercial and industrial property owners in Braintree and across Essex with ageing asbestos roofs, safe removal and replacement offers a compliant, long-term solution. It delivers significant improvements in safety, thermal performance, weather protection and longevity. If you're unsure whether your roof needs replacing yet, our article on the \u003Ca href=\"..\u002F..\u002F..\u002Farticles\u002Fsigns-your-commercial-roof-needs-replacing\">signs your commercial roof needs replacing\u003C\u002Fa> is a good place to start.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Get in touch with Cambridge Roof Exchange today to discuss safely removing and replacing your asbestos roof.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Ca href=\"..\u002F..\u002F..\u002Fcontact\">Book a survey today!\u003C\u002Fa>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">&nbsp;\u003C\u002Fp>","Braintree","Published",false,"Commercial Roof Replacement in Braintree, Essex","See how Cambridge Roof Exchange transformed an ageing industrial roof in Braintree with a full roof replacement along with a 40-year warranty, upgraded insulation and new rooflights.","commercial-roof-replacement-in-braintree-essex","01m3bk2c85b5fzp1henbvj2pe3","01m3bk25yf5waq3950dak391ys",null,"The safe removal and replacement of an ageing roof in Braintree.","2026-07-10T06:44:00.000000Z","2026-09-24T06:44:00.000000Z","2026-09-25T06:45:03.000000Z","2026-10-06T10:43:24.000000Z",{"id":13,"alt":14,"path":21,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":25,"updated_at":25,"url":26},"media-files\u002F20260924-DJI_0944-HDR.jpg","Image","Public","01kz3dpkx4hynn9k8ydhnwx9ep","2026-09-25T06:11:53.000000Z","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002F20260924-DJI_0944-HDR.jpg",[28,37,45,54,62,71,79],{"id":29,"alt":30,"path":31,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":32,"updated_at":32,"pivot":33,"url":36},"01m3bpcb7z7rw2nk7zzf884bx7","Completed new roof installation on the industrial building.","media-files\u002F20260924-DJI_0944-HDR-v3.jpg","2026-09-25T07:09:52.000000Z",{"case_study_id":4,"media_file_id":29,"id":34,"job_phase":35},"01m3bpcbb907mczqwtr7ft8t7v","After","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002F20260924-DJI_0944-HDR-v3.jpg",{"id":38,"alt":39,"path":40,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":41,"updated_at":41,"pivot":42,"url":44},"01m3bpddq7xby1wb1cp52fkmk7","New insulated, weather resistant roofing system following asbestos removal.","media-files\u002F20260924-DJI_0932-HDR.jpg","2026-09-25T07:10:28.000000Z",{"case_study_id":4,"media_file_id":38,"id":43,"job_phase":35},"01m3bpddv5syv01yzfc7rhpv06","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002F20260924-DJI_0932-HDR.jpg",{"id":46,"alt":47,"path":48,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":49,"updated_at":49,"pivot":50,"url":53},"01m3bph51f8fbdbc33epmctjnw","Ageing asbestos roof on industrial building before removal.","media-files\u002FDJI_0222.JPG","2026-09-25T07:12:30.000000Z",{"case_study_id":4,"media_file_id":46,"id":51,"job_phase":52},"01m3bph54kz6nk7ayqb2t9h9pb","Before","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FDJI_0222.JPG",{"id":55,"alt":56,"path":57,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":58,"updated_at":58,"pivot":59,"url":61},"01m3bpnawvykegjfnm8zyyybmh","After works completed","media-files\u002FDJI_0909.JPG","2026-09-25T07:14:47.000000Z",{"case_study_id":4,"media_file_id":55,"id":60,"job_phase":35},"01m3bpnazs8zccm3ws3ee0vx66","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FDJI_0909.JPG",{"id":63,"alt":64,"path":65,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":66,"updated_at":66,"pivot":67,"url":70},"01m3bps8sspqa3abhrk7yyj7m9","Site visit by the Managing Director","media-files\u002FtempImagejqb1tQ.jpg","2026-09-25T07:16:56.000000Z",{"case_study_id":4,"media_file_id":63,"id":68,"job_phase":69},"01m3bps8w9txs973vk61e45hct","During","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FtempImagejqb1tQ.jpg",{"id":72,"alt":73,"path":74,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":75,"updated_at":75,"pivot":76,"url":78},"01m3bqcys9z1j6c5ywk6scz9z8","New roof sheets being installed following asbestos removal","media-files\u002FDJI_0760.JPG","2026-09-25T07:27:41.000000Z",{"case_study_id":4,"media_file_id":72,"id":77,"job_phase":69},"01m3bqcz56121bg9wa5q8evsn9","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FDJI_0760.JPG",{"id":80,"alt":81,"path":82,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":83,"updated_at":83,"pivot":84,"url":86},"01m3bqdw30fbwyp09h28hwp16f","During works.","media-files\u002FDJI_0789.JPG","2026-09-25T07:28:11.000000Z",{"case_study_id":4,"media_file_id":80,"id":85,"job_phase":69},"01m3bqdw8fdzy5sx9vyngy9wsp","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FDJI_0789.JPG",{"id":12,"alt":14,"path":88,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":89,"updated_at":89,"url":90},"media-files\u002F20260924-DJI_0944-HDR-v2.jpg","2026-09-25T06:12:00.000000Z","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002F20260924-DJI_0944-HDR-v2.jpg",[92,109],{"id":93,"title":94,"slug":95,"seo_title":94,"seo_meta_description":96,"icon_image_id":97,"og_image_id":98,"main_image_id":99,"description":96,"content":100,"publish_state":7,"deleted_at":14,"created_at":101,"updated_at":102,"pivot":103,"icon_image":104},"01jc656kdnhaapmsjwj28nzn39","Asbestos Removal","asbestos-removal","Safe asbestos removal across the UK. We remove asbestos cement roof cladding and replace it with modern, compliant materials, even in live environments.","01jhv674zmv8xygtqnwewhn9k6","01jfrvak7dgg2k19qewkm5f449","01jhv52t6h2rpjynzqh74b41as","\u003Cp>\u003Cstrong>\u003Cspan style=\"font-size: 18pt;\">CRE ARE A LEADING PROVIDER OF ASBESTOS REMOVAL SERVICES IN THE UK\u003C\u002Fspan>\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp>Our experienced team of professionals is dedicated to delivering safe asbestos removal solutions that meet the highest industry standards. We specialise in removing asbestos cement roof cladding and replacing it with modern equivalents to ensure compliance with new government guidelines. We are committed to providing the highest level of customer service. We understand that asbestos removal can be a daunting and stressful process, which is why we strive to make it as easy and hassle-free as possible for our clients. Our team is always on hand to answer any questions and provide support throughout the entire process. We take pride in our work and are dedicated to delivering results that exceed our clients' expectations.\u003C\u002Fp>\n\u003Cfigure class=\"image\">\u003Cimg src=\"https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Fbody.png\" alt=\"\" width=\"711\" height=\"454\">\n\u003Cfigcaption>SCROLL DOWN TO SEE THE FAQ BELOW FOR MORE INFORMATION\u003C\u002Ffigcaption>\n\u003C\u002Ffigure>\n\u003Cp>\u003Cimg src=\"https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FCRE_BURY_S01_0795_6.png\" alt=\"\">\u003C\u002Fp>\n\u003Ch3>LIVE ENVIRONMENTS\u003C\u002Fh3>\n\u003Cp>One of our core strengths is our ability to work in live environments. We understand that many of our clients operate in sensitive areas and cannot afford to shut down their operations during the asbestos removal process. That's why we take every precaution to minimise disruption and ensure a seamless transition. Our team works closely with clients to create a detailed plan that takes into account their specific needs and requirements.\u003C\u002Fp>\n\u003Ch3>ASBESTOS REMOVAL COST\u003C\u002Fh3>\n\u003Cp>In order to give you a cost for safely removing asbestos from your premises we would come out to do a survey which will provide the detailed costings.\u003C\u002Fp>","2024-11-08T15:10:06.000000Z","2026-09-03T04:36:36.000000Z",{"case_study_id":4,"service_id":93},{"id":97,"alt":14,"path":105,"type":22,"visibility":23,"created_by_id":106,"deleted_at":14,"created_at":107,"updated_at":107,"url":108},"media-files\u002Fasbestos.svg","01jf7zhwkt8ra9f0004aszb4r2","2025-01-17T22:30:25.000000Z","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Fasbestos.svg",{"id":110,"title":111,"slug":112,"seo_title":111,"seo_meta_description":113,"icon_image_id":114,"og_image_id":115,"main_image_id":116,"description":113,"content":117,"publish_state":7,"deleted_at":14,"created_at":118,"updated_at":119,"pivot":120,"icon_image":121},"01jc65z97wb7axzb9ejsajcznq","Commercial Roofing \u002F Cladding","commercial-roofing-cladding","Commercial & industrial roofing and cladding contractor specialising in refurbishment, over-cladding and EPC upgrades. ISO 9001, 14001 & 45001 accredited.","01jhv6e3j176hepvt1sqt6j8sf","01jfryaqm77b41fk7ccjw4t4cb","01jk58j4xe2af7eyr4r3dyc1m7","\u003Cp>We are the premier Cambridge Commercial Roofing and Cladding contractor. With years of experience in the industry, we specialise in the refurbishment of industrial buildings with an emphasis on asbestos removal and replacement, over cladding projects, and upgrading EPC ratings to meet new government guidelines. Our team has the leading in-house expertise for design, management, customer care, and procurement.\u003C\u002Fp>\n\u003Cfigure class=\"image align-left\">\u003Cimg src=\"https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Fmark-cre-body.png\" alt=\"MARK LANGLEY - MANAGING DIRECTOR\" width=\"711\" height=\"475\">\n\u003Cfigcaption>\u003Cstrong>\u003Cspan style=\"font-size: 8pt;\">MARK LANGLEY - CRE OWNER\u003C\u002Fspan>\u003C\u002Fstrong>\u003C\u002Ffigcaption>\n\u003C\u002Ffigure>\n\u003Cp>&nbsp;\u003C\u002Fp>\n\u003Cp>We are proud to have obtained ISO9001, ISO14001, and ISO45001 accreditations, which highlights our commitment to quality, environmental management, and health and safety. Our accreditations demonstrate our dedication to providing our clients with the highest standards of service possible. We are constantly striving to improve our processes and procedures to ensure that we maintain these high standards.\u003C\u002Fp>\n\u003Cfigure class=\"image\">\u003Cimg src=\"https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Froof-body-v2.png\" alt=\"\" width=\"711\" height=\"471\">\n\u003Cfigcaption>\u003Cspan style=\"font-size: 8pt;\">\u003Ca href=\"..\u002F..\u002F..\u002Fcase-studies\u002Fgreenhill-houses\">GREENHILL HOUSE\u003C\u002Fa> RENOVATION BY CRE\u003C\u002Fspan>\u003C\u002Ffigcaption>\n\u003C\u002Ffigure>\n\u003Cp>&nbsp;\u003C\u002Fp>\n\u003Cp>At Cambridge Roof Exchange Ltd, we have the expertise to deal with projects from the initial enquiry through to completion. We handle all relevant authorities to ensure compliance, including building control and structural compliance. Our team is experienced in dealing with these issues and can provide the necessary advice and support to help our clients navigate the complex regulatory landscape.\u003C\u002Fp>\n\u003Cp>All of our staff have a wealth of experience in the industrial roofing and cladding sector, which allows us to provide not only great advice but also recommend the best solutions for your projects. We have worked on many large-scale projects both nationally and internationally, which has given us the experience and expertise to handle complex projects of any size and scope.\u003C\u002Fp>\n\u003Cfigure class=\"image\">\u003Cimg src=\"https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Fworkers-body.png\" alt=\"\" width=\"711\" height=\"475\">\n\u003Cfigcaption>\u003Cstrong>\u003Cspan style=\"font-size: 8pt;\">WE ARE FULLY CERTIFIED PROFESSIONALS WITH YEARS OF EXPERIENCE ONSITE.&nbsp;\u003C\u002Fspan>\u003C\u002Fstrong>\u003C\u002Ffigcaption>\n\u003C\u002Ffigure>\n\u003Cp>At Cambridge Roof Exchange Ltd, we believe in delivering high-quality services that exceed our clients' expectations. We are committed to providing a safe and healthy work environment for our employees and clients and take health and safety very seriously. Our team is dedicated to ensuring that health and safety is at the forefront of everything we do, and we have a dedicated Health and Safety Manager who is accredited to the highest levels.\u003C\u002Fp>","2024-11-08T15:23:35.000000Z","2026-09-03T04:31:01.000000Z",{"case_study_id":4,"service_id":110},{"id":114,"alt":14,"path":122,"type":22,"visibility":23,"created_by_id":106,"deleted_at":14,"created_at":123,"updated_at":123,"url":124},"media-files\u002Froofing.svg","2025-01-17T22:34:12.000000Z","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Froofing.svg",1791284455042]