[{"data":1,"prerenderedAt":96},["ShallowReactive",2],{"caseStudy:office-overclad-in-histon":3},{"id":4,"job_description":5,"location":6,"publish_state":7,"spotlight":8,"title":9,"seo_title":10,"seo_meta_description":11,"slug":12,"og_image_id":13,"main_image_id":14,"main_video_id":15,"summary":16,"work_started_at":17,"work_completed_at":18,"customer_id":15,"enquiry_id":15,"deleted_at":15,"created_at":19,"updated_at":20,"customer":15,"enquiry":15,"main_image":21,"main_video":15,"media_files":28,"og_image":74,"services":78},"01kznsyrbgefhkha9svea7qxts","\u003Ch1>\u003Cspan style=\"font-size: 14pt;\">Full Video Here:\u003C\u002Fspan>\u003C\u002Fh1>\n\u003Cp>\u003Ca href=\"https:\u002F\u002Fwww.linkedin.com\u002Ffeed\u002Fupdate\u002Furn:li:activity:7493265563369197569\" target=\"_blank\" rel=\"noopener\">Pioneer House - Full Video\u003C\u002Fa>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Pioneer House was a chance to significantly improve the performance, longevity and reliability of an ageing office roof, without the disruption and cost of a complete roof replacement.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Cambridge Roof Exchange designed and delivered a full overcladding solution for around 850m&sup2; of roof. The building now has a new, specification-backed roof system, designed around the existing structure and the building's future needs.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Rather than simply replacing the existing roof, the project focused on improving the building's overall performance, extending the life of the roof and keeping disruption to a minimum. The offices below stayed fully operational throughout the works, and the project was completed ahead of programme.\u003C\u002Fp>\n\u003Cdiv dir=\"ltr\">\n\u003Ctable>\n\u003Cthead>\n\u003Ctr>\n\u003Cth scope=\"col\">Project detail\u003C\u002Fth>\n\u003Cth scope=\"col\">Scope\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003C\u002Fthead>\n\u003Ctbody>\n\u003Ctr>\n\u003Ctd>Client\u003C\u002Ftd>\n\u003Ctd>Pioneer House Management Company\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Contract administrator\u003C\u002Ftd>\n\u003Ctd>Potter Raper\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Location\u003C\u002Ftd>\n\u003Ctd>Histon, Cambridgeshire\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Building\u003C\u002Ftd>\n\u003Ctd>Office building, about 37m &times; 19m, 15&deg; roof pitch\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Project type\u003C\u002Ftd>\n\u003Ctd>Commercial roof overcladding and refurbishment\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Roof area\u003C\u002Ftd>\n\u003Ctd>Around 850m&sup2;\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Existing roof\u003C\u002Ftd>\n\u003Ctd>Coated steel sheets over 25mm PUR insulation board\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>New roof\u003C\u002Ftd>\n\u003Ctd>0.7mm Plastisol-coated profiled steel overclad system\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Insulation\u003C\u002Ftd>\n\u003Ctd>280mm A1 non-combustible glass-fibre quilt\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Roof U-value\u003C\u002Ftd>\n\u003Ctd>0.18 W\u002Fm&sup2;K\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Gutters\u003C\u002Ftd>\n\u003Ctd>Welded PVC membrane gutter lining system\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Guarantee\u003C\u002Ftd>\n\u003Ctd>20-year manufacturer's guarantee\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003C\u002Fdiv>\n\u003Cp dir=\"ltr\">\u003Cstrong>A New Approach to an Existing Roof\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The existing roof was clearly showing its age. A condition survey found metal fatigue in the roof sheets and gutters, rusted fixings and paint worn back to bare metal. Earlier liquid-membrane repairs to the gutters had failed. With only 25mm of insulation beneath the steel sheets, the roof was also losing a significant amount of heat. These are classic \u003Ca href=\"..\u002F..\u002F..\u002Farticles\u002Fsigns-your-commercial-roof-needs-replacing\">signs that a commercial roof needs attention\u003C\u002Fa>, and refurbishment was an important consideration for the future of the building.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Our solution was a new, design- and specification-backed overclad system installed over the existing roof. Overcladding is an effective alternative to complete roof replacement: it upgrades an existing roof while keeping much of the structure beneath.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The new system is built up in layers:\u003C\u002Fp>\n\u003Cul dir=\"ltr\">\n\u003Cli>A vapour control layer laid over the existing roof\u003C\u002Fli>\n\u003Cli>A galvanised steel bar-and-bracket sub-frame fixed through to the existing structure\u003C\u002Fli>\n\u003Cli>280mm of A1 non-combustible glass-fibre insulation\u003C\u002Fli>\n\u003Cli>New 0.7mm profiled steel sheets with a Plastisol coating, secured with stainless steel fixings\u003C\u002Fli>\n\u003Cli>Perimeter cappings colour-matched to the existing wall cladding\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp dir=\"ltr\">The result is a modern, durable external weathering layer and a major improvement in the building's thermal performance. For the client, it meant dealing with the condition of the existing roof while investing in the long-term performance of the property. We took a similar approach on our \u003Ca href=\"..\u002F..\u002F..\u002Fcase-studies\u002Fcommercial-roof-overclad-waterbeach\">commercial overclad in Waterbeach\u003C\u002Fa>.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>Solving Problems Uncovered on Site\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">As with many refurbishment projects, opening up the roof revealed issues that couldn't be fully seen at survey stage. Some of the existing gutters were so badly corroded that they had rotted through. Our team riveted galvanised steel plates into the gutters to restore their strength before the new lining went in.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The existing purlins were also more widely spaced than ideal for the new system, so we installed additional intermediate Z-bars to give the overclad the support it needed. Dealing with these issues properly during the works means the new roof is built on a sound foundation.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>Improved Thermal Performance\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">A key objective of the project was to improve the building's thermal efficiency.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The new overclad system includes 280mm of glass-fibre insulation, taking the roof to a calculated U-value of 0.18 W\u002Fm&sup2;K, a dramatic improvement on the original 25mm insulation board. A condensation risk analysis confirmed there is no risk of mould growth within the new build-up.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">For commercial properties, upgrading the roof specification can play an important part in reducing energy demand and \u003Ca href=\"..\u002F..\u002F..\u002Farticles\u002Fhow-your-roof-can-improve-a-commercial-epc-rating\">improving a building's EPC rating\u003C\u002Fa>. The upgrade also gives Pioneer House a more modern roofing specification, helping to future-proof the property.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>A 20-Year Manufacturer's Guarantee\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The completed roofing system is backed by a 20-year manufacturer's guarantee, giving the client extra confidence in the installation and the performance of the new roof.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">For a commercial property owner, a roof is a significant investment. The aim is not just to complete the work and hand over a new roof, but to provide a system that offers long-term protection and reassurance.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The manufacturer inspected the works throughout the project. At the final sign-off inspection, they rated the workmanship as \"excellent\" and recorded no defects.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>PVC Membrane Gutter Lining System\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">As part of the refurbishment, Cambridge Roof Exchange installed a welded PVC membrane gutter lining system. We also used liquid-applied detailing at the outlets and pipe penetrations.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Gutters are a critical part of any commercial roofing system. Even a high-quality roof can be compromised if water management isn't properly addressed. The new gutter lining provides a durable waterproofing solution that protects the building from water ingress and keeps the roof drainage working effectively alongside the new roof.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">By treating the roof and gutters as one refurbishment rather than separate problems, we were able to provide a more complete solution for the building.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>Complete Site Setup\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">A successful commercial roofing project involves far more than installing the roof itself.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">At Pioneer House, Cambridge Roof Exchange provided a full site setup so the works could be carried out safely and efficiently while the offices below stayed in use. This included:\u003C\u002Fp>\n\u003Cul dir=\"ltr\">\n\u003Cli>Welfare facilities\u003C\u002Fli>\n\u003Cli>A secure Heras-fenced site compound\u003C\u002Fli>\n\u003Cli>Scaffold edge protection and debris netting\u003C\u002Fli>\n\u003Cli>A lockable stair tower for safe roof access\u003C\u002Fli>\n\u003Cli>A 14m telehandler and boom lift for materials handling\u003C\u002Fli>\n\u003Cli>Waste disposal\u003C\u002Fli>\n\u003Cli>Site management and coordination\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp dir=\"ltr\">Working on an occupied commercial building also needs careful thought about the surrounding environment. Site access, materials, waste, safety and the day-to-day running of the building all have to be managed alongside the roofing works. The project ran through a hot summer, with temperatures of 25&ndash;30&deg;C, which the team managed with early starts and extra labour to keep the programme on track.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Our approach was to coordinate all of these requirements as part of the overall project, rather than treating them as an afterthought.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>Refurbish Rather Than Replace\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Pioneer House is a good example of why an ageing commercial roof does not always need a complete replacement.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">An overcladding system can be a practical way to upgrade an existing roof, improve thermal performance and extend its service life without removing the entire existing roof structure. It's often a more cost-effective route too. Our article on \u003Ca href=\"..\u002F..\u002F..\u002Farticles\u002Fcost-of-an-industrial-roof-replacement-in-the-uk\">what affects the cost of an industrial roof replacement\u003C\u002Fa> explains the factors involved.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Every building is different, though. The right solution depends on the condition of the existing roof, the structure of the building, the thermal performance needed and the client's long-term plans for the property. That's why the design and specification stage is so important.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">At Cambridge Roof Exchange, we assess the existing building before recommending a solution. Where appropriate, overcladding can be an efficient way to turn an ageing roof into a modern, higher-performing roofing system.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>The Result\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The finished project delivered:\u003C\u002Fp>\n\u003Cul dir=\"ltr\">\n\u003Cli>Around 850m&sup2; of ageing roof overclad with a new profiled steel system\u003C\u002Fli>\n\u003Cli>280mm of A1 non-combustible insulation, taking the roof to a U-value of 0.18 W\u002Fm&sup2;K\u003C\u002Fli>\n\u003Cli>Corroded gutters strengthened and lined with a welded PVC membrane system\u003C\u002Fli>\n\u003Cli>Offices kept fully operational throughout the works\u003C\u002Fli>\n\u003Cli>Completion ahead of programme\u003C\u002Fli>\n\u003Cli>Workmanship rated \"excellent\" by the manufacturer, with no defects recorded\u003C\u002Fli>\n\u003Cli>A 20-year manufacturer's guarantee\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp dir=\"ltr\">From the initial design and specification through to installation, gutter lining and full site setup, Cambridge Roof Exchange delivered a complete commercial roofing solution designed around the building and its needs.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>Is Your Commercial Roof Showing Its Age?\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">If your commercial roof is ageing but structurally sound, overcladding could give you a modern, energy-efficient roof without the cost and disruption of full replacement. Get in touch to discuss your options.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Ca href=\"..\u002F..\u002F..\u002Fcontact\">Book a survey today!\u003C\u002Fa>\u003C\u002Fp>","Cambridge","Published",false,"Office Overclad in Histon, Cambridge","Office Overclad in Histon","Pioneer House roof refurbishment by Cambridge Roof Exchange, featuring a new overclad system, improved thermal performance, PVC gutter lining and a 25-year warranty.","office-overclad-in-histon","01m1gz4tnmdw0eszgggqn5b4wq","01m1gz46efg9xs0cpnfrzbqkvv",null,"This was a commercial roof overclad.","2026-07-02T12:18:00.000000Z","2026-08-03T12:20:00.000000Z","2026-08-10T12:21:58.000000Z","2026-10-06T10:59:57.000000Z",{"id":14,"alt":15,"path":22,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":26,"updated_at":26,"url":27},"media-files\u002FDJI_0477-v4.JPG","Image","Public","01kz3dpkx4hynn9k8ydhnwx9ep","2026-09-02T11:47:31.000000Z","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FDJI_0477-v4.JPG",[29,37,44,52,60,67],{"id":30,"alt":31,"path":32,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":33,"updated_at":33,"pivot":34,"url":36},"01m1gy0yc87d9px6gwq8476v0a","Before","media-files\u002FDJI_0282.JPG","2026-09-02T11:28:16.000000Z",{"case_study_id":4,"media_file_id":30,"id":35,"job_phase":31},"01m1gy0yeztw7b2eb7nt9wjhha","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FDJI_0282.JPG",{"id":38,"alt":31,"path":39,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":40,"updated_at":40,"pivot":41,"url":43},"01m1gy1w4wamaj9qsy3t7ynmqt","media-files\u002FDJI_0309.JPG","2026-09-02T11:28:46.000000Z",{"case_study_id":4,"media_file_id":38,"id":42,"job_phase":31},"01m1gy1w960h15ahp0prntzkmb","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FDJI_0309.JPG",{"id":45,"alt":46,"path":47,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":48,"updated_at":48,"pivot":49,"url":51},"01m1gy2q286rree8s42bpr5sc3","During","media-files\u002FDJI_0328.JPG","2026-09-02T11:29:14.000000Z",{"case_study_id":4,"media_file_id":45,"id":50,"job_phase":46},"01m1gy2q4wa9b3b6axekgghkcj","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FDJI_0328.JPG",{"id":53,"alt":54,"path":55,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":56,"updated_at":56,"pivot":57,"url":59},"01m1gy3eyf04zcq9bptdye53ab","After","media-files\u002FDJI_0483.JPG","2026-09-02T11:29:38.000000Z",{"case_study_id":4,"media_file_id":53,"id":58,"job_phase":54},"01m1gy3f1m2wpdw0ad3tp5pnty","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FDJI_0483.JPG",{"id":61,"alt":54,"path":62,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":63,"updated_at":63,"pivot":64,"url":66},"01m1gy4a6f9p5s8dzdrjk4qwvr","media-files\u002FDJI_0478.JPG","2026-09-02T11:30:06.000000Z",{"case_study_id":4,"media_file_id":61,"id":65,"job_phase":54},"01m1gy4ae7yzjc14q8vgnb146t","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FDJI_0478.JPG",{"id":68,"alt":54,"path":69,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":70,"updated_at":70,"pivot":71,"url":73},"01m1gy523r390jb655xc32ghv8","media-files\u002FDJI_0472.JPG","2026-09-02T11:30:31.000000Z",{"case_study_id":4,"media_file_id":68,"id":72,"job_phase":54},"01m1gy527fh9vharmtnwknvkzn","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FDJI_0472.JPG",{"id":13,"alt":15,"path":75,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":76,"updated_at":76,"url":77},"media-files\u002FDJI_0477-v5.JPG","2026-09-02T11:47:52.000000Z","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FDJI_0477-v5.JPG",[79],{"id":80,"title":81,"slug":82,"seo_title":81,"seo_meta_description":83,"icon_image_id":84,"og_image_id":85,"main_image_id":86,"description":83,"content":87,"publish_state":7,"deleted_at":15,"created_at":88,"updated_at":89,"pivot":90,"icon_image":91},"01jc65z97wb7axzb9ejsajcznq","Commercial Roofing \u002F Cladding","commercial-roofing-cladding","Commercial & industrial roofing and cladding contractor specialising in refurbishment, over-cladding and EPC upgrades. ISO 9001, 14001 & 45001 accredited.","01jhv6e3j176hepvt1sqt6j8sf","01jfryaqm77b41fk7ccjw4t4cb","01jk58j4xe2af7eyr4r3dyc1m7","\u003Cp>We are the premier Cambridge Commercial Roofing and Cladding contractor. With years of experience in the industry, we specialise in the refurbishment of industrial buildings with an emphasis on asbestos removal and replacement, over cladding projects, and upgrading EPC ratings to meet new government guidelines. Our team has the leading in-house expertise for design, management, customer care, and procurement.\u003C\u002Fp>\n\u003Cfigure class=\"image align-left\">\u003Cimg src=\"https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Fmark-cre-body.png\" alt=\"MARK LANGLEY - MANAGING DIRECTOR\" width=\"711\" height=\"475\">\n\u003Cfigcaption>\u003Cstrong>\u003Cspan style=\"font-size: 8pt;\">MARK LANGLEY - CRE OWNER\u003C\u002Fspan>\u003C\u002Fstrong>\u003C\u002Ffigcaption>\n\u003C\u002Ffigure>\n\u003Cp>&nbsp;\u003C\u002Fp>\n\u003Cp>We are proud to have obtained ISO9001, ISO14001, and ISO45001 accreditations, which highlights our commitment to quality, environmental management, and health and safety. Our accreditations demonstrate our dedication to providing our clients with the highest standards of service possible. We are constantly striving to improve our processes and procedures to ensure that we maintain these high standards.\u003C\u002Fp>\n\u003Cfigure class=\"image\">\u003Cimg src=\"https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Froof-body-v2.png\" alt=\"\" width=\"711\" height=\"471\">\n\u003Cfigcaption>\u003Cspan style=\"font-size: 8pt;\">\u003Ca href=\"..\u002F..\u002F..\u002Fcase-studies\u002Fgreenhill-houses\">GREENHILL HOUSE\u003C\u002Fa> RENOVATION BY CRE\u003C\u002Fspan>\u003C\u002Ffigcaption>\n\u003C\u002Ffigure>\n\u003Cp>&nbsp;\u003C\u002Fp>\n\u003Cp>At Cambridge Roof Exchange Ltd, we have the expertise to deal with projects from the initial enquiry through to completion. We handle all relevant authorities to ensure compliance, including building control and structural compliance. Our team is experienced in dealing with these issues and can provide the necessary advice and support to help our clients navigate the complex regulatory landscape.\u003C\u002Fp>\n\u003Cp>All of our staff have a wealth of experience in the industrial roofing and cladding sector, which allows us to provide not only great advice but also recommend the best solutions for your projects. We have worked on many large-scale projects both nationally and internationally, which has given us the experience and expertise to handle complex projects of any size and scope.\u003C\u002Fp>\n\u003Cfigure class=\"image\">\u003Cimg src=\"https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Fworkers-body.png\" alt=\"\" width=\"711\" height=\"475\">\n\u003Cfigcaption>\u003Cstrong>\u003Cspan style=\"font-size: 8pt;\">WE ARE FULLY CERTIFIED PROFESSIONALS WITH YEARS OF EXPERIENCE ONSITE.&nbsp;\u003C\u002Fspan>\u003C\u002Fstrong>\u003C\u002Ffigcaption>\n\u003C\u002Ffigure>\n\u003Cp>At Cambridge Roof Exchange Ltd, we believe in delivering high-quality services that exceed our clients' expectations. We are committed to providing a safe and healthy work environment for our employees and clients and take health and safety very seriously. Our team is dedicated to ensuring that health and safety is at the forefront of everything we do, and we have a dedicated Health and Safety Manager who is accredited to the highest levels.\u003C\u002Fp>","2024-11-08T15:23:35.000000Z","2026-09-03T04:31:01.000000Z",{"case_study_id":4,"service_id":80},{"id":84,"alt":15,"path":92,"type":23,"visibility":24,"created_by_id":93,"deleted_at":15,"created_at":94,"updated_at":94,"url":95},"media-files\u002Froofing.svg","01jf7zhwkt8ra9f0004aszb4r2","2025-01-17T22:34:12.000000Z","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Froofing.svg",1791284455041]