[{"data":1,"prerenderedAt":146},["ShallowReactive",2],{"caseStudy:roof-refurbishment-and-solar-in-bury-st-edmunds":3},{"id":4,"job_description":5,"location":6,"publish_state":7,"spotlight":8,"title":9,"seo_title":10,"seo_meta_description":11,"slug":12,"og_image_id":13,"main_image_id":14,"main_video_id":15,"summary":16,"work_started_at":17,"work_completed_at":18,"customer_id":15,"enquiry_id":15,"deleted_at":15,"created_at":19,"updated_at":20,"customer":15,"enquiry":15,"main_image":21,"main_video":15,"media_files":28,"og_image":91,"services":95},"01m3402s6tmgktdcvnpg5aaf0d","\u003Ch1>\u003Cspan style=\"font-size: 14pt;\">Full Video:\u003C\u002Fspan>\u003C\u002Fh1>\n\u003Cp>\u003Cspan style=\"color: #000000;\">\u003Ca style=\"color: #000000;\" href=\"https:\u002F\u002Fwww.linkedin.com\u002Ffeed\u002Fupdate\u002Furn:li:activity:7498648369372987392\" target=\"_blank\" rel=\"noopener\">SRS Aromatics - Full Video\u003C\u002Fa>\u003C\u002Fspan>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Safe asbestos roof removal and installation of a new 130mm composite roofing system across two warehouse units, complete with 68 new rooflights, upgraded roof details and a 98 kWp rooftop solar array.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">We delivered a full commercial roof refurbishment for SRS Aromatics Ltd at Beodric House in Bury St Edmunds. We replaced 1,120m&sup2; of asbestos roofing with a modern composite roofing system designed for long-term performance.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The project brought together asbestos roof removal, roof replacement, better natural daylight, improved rainwater management and a base for on-site solar generation. Completed to the required specification between November 2025 and January 2026, the refurbishment has given the building a safer, more energy-efficient roof that now generates its own power.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>Project Overview\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cdiv dir=\"ltr\">\n\u003Ctable>\n\u003Cthead>\n\u003Ctr>\n\u003Cth scope=\"col\">Project detail\u003C\u002Fth>\n\u003Cth scope=\"col\">Scope\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003C\u002Fthead>\n\u003Ctbody>\n\u003Ctr>\n\u003Ctd>Client\u003C\u002Ftd>\n\u003Ctd>SRS Aromatics Ltd\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Location\u003C\u002Ftd>\n\u003Ctd>Bury St Edmunds, Suffolk\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Project type\u003C\u002Ftd>\n\u003Ctd>Commercial roof refurbishment\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Roof area\u003C\u002Ftd>\n\u003Ctd>1,120m&sup2; across two warehouse units, plus 340m&sup2; of parapets\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Existing roof\u003C\u002Ftd>\n\u003Ctd>Asbestos cement roofing\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>New roof\u003C\u002Ftd>\n\u003Ctd>Joris Ide 130mm PIR composite panel system (FM Approved)\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Roof U-value\u003C\u002Ftd>\n\u003Ctd>0.16 W\u002Fm&sup2;K\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Rooflights\u003C\u002Ftd>\n\u003Ctd>68 new rooflights, about 180m&sup2;\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Gutters\u003C\u002Ftd>\n\u003Ctd>129m of new insulated, single-ply-lined gutters\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Solar PV\u003C\u002Ftd>\n\u003Ctd>98 kWp from 152 panels\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003C\u002Fdiv>\n\u003Cp dir=\"ltr\">\u003Cstrong>The Brief: A Complete Commercial Roof Upgrade\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The brief was to refurbish the roofs of both warehouse units and provide a replacement system suited to the building's long-term needs. A key part of the project was the safe removal of the asbestos cement roofing, followed by the installation of a new 130mm composite roofing system.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The refurbishment also went beyond the main roof covering. Rooflights, flashings, gutters and parapets were all in the scope, so these important elements were dealt with as part of the overall roof upgrade.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Together, the works focused on improving the building's safety, energy efficiency, natural daylight and protection from the weather.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>Safe Removal of the Existing Asbestos Roof\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The first stage was the safe removal of the existing asbestos cement roof, carried out by our own trained team under non-licensed asbestos controls. Asbestos cement sheeting is common on industrial buildings of this era; our guide to \u003Ca href=\"..\u002F..\u002F..\u002Farticles\u002Fasbestos-roofs-on-pre-2000-industrial-buildings\">asbestos roofs on pre-2000 industrial buildings\u003C\u002Fa> explains what owners need to know.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Before any sheets were lifted, we installed 1,200m&sup2; of safety netting beneath the roof, along with perimeter edge protection. This protected operatives throughout the strip and re-sheet. Asbestos waste was segregated into dedicated hazardous waste skips for safe disposal.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Removing the old roof let us deliver a full refurbishment, with the new roofing system and associated details installed as one coordinated project.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>Installation of a 130mm Composite Roofing System\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Once the existing roofing was removed, we installed a new Joris Ide composite roofing system with a 130mm PIR insulated core. It has an HPS200 coated finish in Goosewing Grey. We used the same system on our \u003Ca href=\"..\u002F..\u002F..\u002Fcase-studies\u002Fcommercial-roof-replacement-in-braintree\">commercial roof replacement in Braintree\u003C\u002Fa>.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Composite roof panels combine an external weathering surface with an insulated core. The new roof achieves a U-value of 0.16 W\u002Fm&sup2;K, a major improvement on the poorly insulated asbestos sheets it replaced. The panels are FM Approved and backed by a 40-year manufacturer's warranty.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The installation also transformed the roof's appearance, giving both units a clean, consistent finish.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>Replacement Rooflights to Improve Natural Daylight\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">As part of the roof replacement, we installed 68 new rooflights, covering about 180m&sup2;, or around 16% of the roof area.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">Rooflights bring daylight into internal areas that get little light from windows. More natural light can reduce reliance on artificial lighting during the day and makes for a brighter working environment.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The new thermally efficient rooflights achieve a U-value of 0.95 W\u002Fm&sup2;K. That means the extra daylight doesn't come at the cost of heat loss.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>Upgraded Flashings, Gutters and Parapets\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">A complete roof refurbishment needs attention to the details around the main roof covering. Alongside the composite roof, we upgraded the flashings, gutters and 340m&sup2; of parapets:\u003C\u002Fp>\n\u003Cul dir=\"ltr\">\n\u003Cli>\u003Cstrong>Flashings\u003C\u002Fstrong> protect junctions and transitions against water getting in.\u003C\u002Fli>\n\u003Cli>\u003Cstrong>Gutters:\u003C\u002Fstrong> we installed 129m of new gutters, lined with 25mm PIR insulation and a steel-laminated single-ply membrane with heat-welded joints, to collect and carry rainwater away reliably.\u003C\u002Fli>\n\u003Cli>\u003Cstrong>Parapets\u003C\u002Fstrong> were re-clad and fitted with new capping to protect the exposed roof edges and their connections with the surrounding structure.\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp dir=\"ltr\">Including these elements meant the project covered both the main roof and the details that support effective weather protection and drainage.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>Solar PV: Turning the New Roof into a Power Source\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The new composite roof gave SRS Aromatics the ideal base for on-site renewable energy. Once the roof was complete, a 98 kWp solar PV system was installed on it. If you're considering solar, read our guide: \u003Ca href=\"..\u002F..\u002F..\u002Farticles\u002Findustrial-roofs-and-solar-is-your-roof-ready\">Industrial Roofs and Solar: Is Your Roof Ready?\u003C\u002Fa>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The system has 152 high-output 645W panels and two 40kW inverters, and was commissioned in January 2026. It's forecast to generate around 81,000 kWh of clean electricity a year, cutting the building's reliance on the grid and lowering its running costs.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>The Result: A Safer, More Energy-Efficient Building\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The completed project has given SRS Aromatics Ltd a modern roofing system designed for long-term performance, with every part of the work delivered to the required specification.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">The refurbishment delivered:\u003C\u002Fp>\n\u003Cul dir=\"ltr\">\n\u003Cli>Safe removal of 1,120m&sup2; of asbestos cement roofing.\u003C\u002Fli>\n\u003Cli>A new insulated 130mm composite roof achieving a U-value of 0.16 W\u002Fm&sup2;K.\u003C\u002Fli>\n\u003Cli>68 new rooflights bringing in more natural daylight.\u003C\u002Fli>\n\u003Cli>129m of new insulated gutters, plus upgraded flashings and 340m&sup2; of parapets.\u003C\u002Fli>\n\u003Cli>A roof ready to carry a 98 kWp solar array, forecast to generate around 81,000 kWh a year.\u003C\u002Fli>\n\u003Cli>A refreshed roof appearance and better overall building performance.\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp dir=\"ltr\">By bringing the roof covering, rooflights and details together in one refurbishment, we delivered a complete upgrade that supports the building's continued use for decades to come.\u003C\u002Fp>\n\u003Cp dir=\"ltr\">\u003Cstrong>Planning an Asbestos Roof Replacement?\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp dir=\"ltr\">If your industrial or commercial building still has an asbestos roof, we can help you plan a safe, cost-effective replacement. Find out \u003Ca href=\"..\u002F..\u002F..\u002Farticles\u002Fcost-of-an-industrial-roof-replacement-in-the-uk\">what affects the cost of an industrial roof replacement\u003C\u002Fa>, or \u003Ca href=\"..\u002F..\u002F..\u002Fcontact\">request a survey\u003C\u002Fa> and our team will assess your roof.\u003C\u002Fp>","Bury St. Edmunds","Published",false,"SRS Aromatics Roof Refurbishment & Solar Preparation","Roof Refurbishment & Solar Preparation in Bury St Edmunds","Commercial roof refurbishment for SRS Aromatics, including asbestos removal, 130mm composite roofing, new rooflights and preparation for future solar panels.","roof-refurbishment-and-solar-in-bury-st-edmunds","01m3402pqf9x7tj0rnecsa92re","01m3401mfrjd49wgfmhtn2b9qp",null,"Full asbestos roof replacement for SRS Aromatics.","2025-11-06T08:23:00.000000Z","2026-01-06T08:24:00.000000Z","2026-09-22T07:25:29.000000Z","2026-10-06T10:33:02.000000Z",{"id":14,"alt":15,"path":22,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":26,"updated_at":26,"url":27},"media-files\u002FScreenshot_2026-09-22_at_75446AM.png","Image","Public","01kz3dpkx4hynn9k8ydhnwx9ep","2026-09-22T07:24:52.000000Z","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FScreenshot_2026-09-22_at_75446AM.png",[29,38,45,54,61,68,77,84],{"id":30,"alt":31,"path":32,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":33,"updated_at":33,"pivot":34,"url":37},"01m3403hz55xamsshwvaejfycc","Before works","media-files\u002FScreenshot_2026-09-22_at_74601AM.png","2026-09-22T07:25:55.000000Z",{"case_study_id":4,"media_file_id":30,"id":35,"job_phase":36},"01m3403j2cchk40j0cqwvne6hn","Before","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FScreenshot_2026-09-22_at_74601AM.png",{"id":39,"alt":31,"path":40,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":41,"updated_at":41,"pivot":42,"url":44},"01m3404pwt9ckgtb534xdpm299","media-files\u002FScreenshot_2026-09-22_at_74911AM.png","2026-09-22T07:26:32.000000Z",{"case_study_id":4,"media_file_id":39,"id":43,"job_phase":36},"01m3404pzmbxynzhc78saabndw","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FScreenshot_2026-09-22_at_74911AM.png",{"id":46,"alt":47,"path":48,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":49,"updated_at":49,"pivot":50,"url":53},"01m3405vjj1yx8nt25xmt6xcks","During works","media-files\u002FScreenshot_2026-09-22_at_74927AM.png","2026-09-22T07:27:10.000000Z",{"case_study_id":4,"media_file_id":46,"id":51,"job_phase":52},"01m3405vn36yphbykn38tymkgs","During","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FScreenshot_2026-09-22_at_74927AM.png",{"id":55,"alt":47,"path":56,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":57,"updated_at":57,"pivot":58,"url":60},"01m3406teke2g2xap1b7m6pjpy","media-files\u002FScreenshot_2026-09-22_at_75002AM.png","2026-09-22T07:27:42.000000Z",{"case_study_id":4,"media_file_id":55,"id":59,"job_phase":52},"01m3406tmrdzwhahdwhbmxe4qz","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FScreenshot_2026-09-22_at_75002AM.png",{"id":62,"alt":47,"path":63,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":64,"updated_at":64,"pivot":65,"url":67},"01m3407kxnakr8bk8xx0g3bd81","media-files\u002FScreenshot_2026-09-22_at_75117AM.png","2026-09-22T07:28:08.000000Z",{"case_study_id":4,"media_file_id":62,"id":66,"job_phase":52},"01m3407m0d2qb05fqex4gna9tz","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FScreenshot_2026-09-22_at_75117AM.png",{"id":69,"alt":70,"path":71,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":72,"updated_at":72,"pivot":73,"url":76},"01m34087yncjt7985tenn02tmt","After works","media-files\u002FScreenshot_2026-09-22_at_75446AM-v3.png","2026-09-22T07:28:28.000000Z",{"case_study_id":4,"media_file_id":69,"id":74,"job_phase":75},"01m340881f07wm9w682nngpc2m","After","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FScreenshot_2026-09-22_at_75446AM-v3.png",{"id":78,"alt":70,"path":79,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":80,"updated_at":80,"pivot":81,"url":83},"01m3408sjaedq5y3pet6czjag8","media-files\u002FScreenshot_2026-09-22_at_75519AM.png","2026-09-22T07:28:46.000000Z",{"case_study_id":4,"media_file_id":78,"id":82,"job_phase":75},"01m3408sqnb5jfb6tpf81zcs1n","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FScreenshot_2026-09-22_at_75519AM.png",{"id":85,"alt":70,"path":86,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":87,"updated_at":87,"pivot":88,"url":90},"01m3409fygpm4x1tenjdk1p8c9","media-files\u002FScreenshot_2026-09-22_at_75612AM.png","2026-09-22T07:29:09.000000Z",{"case_study_id":4,"media_file_id":85,"id":89,"job_phase":75},"01m3409g114k8azrms2c4xd2j1","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FScreenshot_2026-09-22_at_75612AM.png",{"id":13,"alt":15,"path":92,"type":23,"visibility":24,"created_by_id":25,"deleted_at":15,"created_at":93,"updated_at":93,"url":94},"media-files\u002FScreenshot_2026-09-22_at_75446AM-v2.png","2026-09-22T07:25:27.000000Z","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FScreenshot_2026-09-22_at_75446AM-v2.png",[96,113,129],{"id":97,"title":98,"slug":99,"seo_title":98,"seo_meta_description":100,"icon_image_id":101,"og_image_id":102,"main_image_id":103,"description":100,"content":104,"publish_state":7,"deleted_at":15,"created_at":105,"updated_at":106,"pivot":107,"icon_image":108},"01jc656kdnhaapmsjwj28nzn39","Asbestos Removal","asbestos-removal","Safe asbestos removal across the UK. We remove asbestos cement roof cladding and replace it with modern, compliant materials, even in live environments.","01jhv674zmv8xygtqnwewhn9k6","01jfrvak7dgg2k19qewkm5f449","01jhv52t6h2rpjynzqh74b41as","\u003Cp>\u003Cstrong>\u003Cspan style=\"font-size: 18pt;\">CRE ARE A LEADING PROVIDER OF ASBESTOS REMOVAL SERVICES IN THE UK\u003C\u002Fspan>\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp>Our experienced team of professionals is dedicated to delivering safe asbestos removal solutions that meet the highest industry standards. We specialise in removing asbestos cement roof cladding and replacing it with modern equivalents to ensure compliance with new government guidelines. We are committed to providing the highest level of customer service. We understand that asbestos removal can be a daunting and stressful process, which is why we strive to make it as easy and hassle-free as possible for our clients. Our team is always on hand to answer any questions and provide support throughout the entire process. We take pride in our work and are dedicated to delivering results that exceed our clients' expectations.\u003C\u002Fp>\n\u003Cfigure class=\"image\">\u003Cimg src=\"https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Fbody.png\" alt=\"\" width=\"711\" height=\"454\">\n\u003Cfigcaption>SCROLL DOWN TO SEE THE FAQ BELOW FOR MORE INFORMATION\u003C\u002Ffigcaption>\n\u003C\u002Ffigure>\n\u003Cp>\u003Cimg src=\"https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FCRE_BURY_S01_0795_6.png\" alt=\"\">\u003C\u002Fp>\n\u003Ch3>LIVE ENVIRONMENTS\u003C\u002Fh3>\n\u003Cp>One of our core strengths is our ability to work in live environments. We understand that many of our clients operate in sensitive areas and cannot afford to shut down their operations during the asbestos removal process. That's why we take every precaution to minimise disruption and ensure a seamless transition. Our team works closely with clients to create a detailed plan that takes into account their specific needs and requirements.\u003C\u002Fp>\n\u003Ch3>ASBESTOS REMOVAL COST\u003C\u002Fh3>\n\u003Cp>In order to give you a cost for safely removing asbestos from your premises we would come out to do a survey which will provide the detailed costings.\u003C\u002Fp>","2024-11-08T15:10:06.000000Z","2026-09-03T04:36:36.000000Z",{"case_study_id":4,"service_id":97},{"id":101,"alt":15,"path":109,"type":23,"visibility":24,"created_by_id":110,"deleted_at":15,"created_at":111,"updated_at":111,"url":112},"media-files\u002Fasbestos.svg","01jf7zhwkt8ra9f0004aszb4r2","2025-01-17T22:30:25.000000Z","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Fasbestos.svg",{"id":114,"title":115,"slug":116,"seo_title":115,"seo_meta_description":117,"icon_image_id":118,"og_image_id":119,"main_image_id":120,"description":117,"content":121,"publish_state":7,"deleted_at":15,"created_at":122,"updated_at":123,"pivot":124,"icon_image":125},"01jc65z97wb7axzb9ejsajcznq","Commercial Roofing \u002F Cladding","commercial-roofing-cladding","Commercial & industrial roofing and cladding contractor specialising in refurbishment, over-cladding and EPC upgrades. ISO 9001, 14001 & 45001 accredited.","01jhv6e3j176hepvt1sqt6j8sf","01jfryaqm77b41fk7ccjw4t4cb","01jk58j4xe2af7eyr4r3dyc1m7","\u003Cp>We are the premier Cambridge Commercial Roofing and Cladding contractor. With years of experience in the industry, we specialise in the refurbishment of industrial buildings with an emphasis on asbestos removal and replacement, over cladding projects, and upgrading EPC ratings to meet new government guidelines. Our team has the leading in-house expertise for design, management, customer care, and procurement.\u003C\u002Fp>\n\u003Cfigure class=\"image align-left\">\u003Cimg src=\"https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Fmark-cre-body.png\" alt=\"MARK LANGLEY - MANAGING DIRECTOR\" width=\"711\" height=\"475\">\n\u003Cfigcaption>\u003Cstrong>\u003Cspan style=\"font-size: 8pt;\">MARK LANGLEY - CRE OWNER\u003C\u002Fspan>\u003C\u002Fstrong>\u003C\u002Ffigcaption>\n\u003C\u002Ffigure>\n\u003Cp>&nbsp;\u003C\u002Fp>\n\u003Cp>We are proud to have obtained ISO9001, ISO14001, and ISO45001 accreditations, which highlights our commitment to quality, environmental management, and health and safety. Our accreditations demonstrate our dedication to providing our clients with the highest standards of service possible. We are constantly striving to improve our processes and procedures to ensure that we maintain these high standards.\u003C\u002Fp>\n\u003Cfigure class=\"image\">\u003Cimg src=\"https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Froof-body-v2.png\" alt=\"\" width=\"711\" height=\"471\">\n\u003Cfigcaption>\u003Cspan style=\"font-size: 8pt;\">\u003Ca href=\"..\u002F..\u002F..\u002Fcase-studies\u002Fgreenhill-houses\">GREENHILL HOUSE\u003C\u002Fa> RENOVATION BY CRE\u003C\u002Fspan>\u003C\u002Ffigcaption>\n\u003C\u002Ffigure>\n\u003Cp>&nbsp;\u003C\u002Fp>\n\u003Cp>At Cambridge Roof Exchange Ltd, we have the expertise to deal with projects from the initial enquiry through to completion. We handle all relevant authorities to ensure compliance, including building control and structural compliance. Our team is experienced in dealing with these issues and can provide the necessary advice and support to help our clients navigate the complex regulatory landscape.\u003C\u002Fp>\n\u003Cp>All of our staff have a wealth of experience in the industrial roofing and cladding sector, which allows us to provide not only great advice but also recommend the best solutions for your projects. We have worked on many large-scale projects both nationally and internationally, which has given us the experience and expertise to handle complex projects of any size and scope.\u003C\u002Fp>\n\u003Cfigure class=\"image\">\u003Cimg src=\"https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Fworkers-body.png\" alt=\"\" width=\"711\" height=\"475\">\n\u003Cfigcaption>\u003Cstrong>\u003Cspan style=\"font-size: 8pt;\">WE ARE FULLY CERTIFIED PROFESSIONALS WITH YEARS OF EXPERIENCE ONSITE.&nbsp;\u003C\u002Fspan>\u003C\u002Fstrong>\u003C\u002Ffigcaption>\n\u003C\u002Ffigure>\n\u003Cp>At Cambridge Roof Exchange Ltd, we believe in delivering high-quality services that exceed our clients' expectations. We are committed to providing a safe and healthy work environment for our employees and clients and take health and safety very seriously. Our team is dedicated to ensuring that health and safety is at the forefront of everything we do, and we have a dedicated Health and Safety Manager who is accredited to the highest levels.\u003C\u002Fp>","2024-11-08T15:23:35.000000Z","2026-09-03T04:31:01.000000Z",{"case_study_id":4,"service_id":114},{"id":118,"alt":15,"path":126,"type":23,"visibility":24,"created_by_id":110,"deleted_at":15,"created_at":127,"updated_at":127,"url":128},"media-files\u002Froofing.svg","2025-01-17T22:34:12.000000Z","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Froofing.svg",{"id":130,"title":131,"slug":132,"seo_title":131,"seo_meta_description":133,"icon_image_id":134,"og_image_id":135,"main_image_id":136,"description":133,"content":137,"publish_state":138,"deleted_at":15,"created_at":139,"updated_at":140,"pivot":141,"icon_image":142},"01jezzy2kq4thz7r68q4w39kj1","Industrial Roof Lights","industrial-roof-lights","We remove old degraded industrial roof lights and replace them with new polycarbonate or GRP industrial roof lights.","01jhv67txrf6bm8nesny1rcn33","01jfrz9j25aw0pmbyd40skmqj8","01jfrz8kmyrhxeszxk05tz8xj8","\u003Cp>At Cambridge Roof Exchange, we are experts in the refurbishment of industrial buildings, with a particular specialism in changing industrial roof lights or warehouse roof lights. We understand that roof lights play a vital role in the functionality of industrial buildings, as they allow natural light to enter and reduce the reliance on artificial lighting. We remove old degraded industrial roof lights and replace them with new polycarbonate or GRP, depending on the project requirements. Our team has extensive experience in this area, which enables us to provide our clients with the best solutions for their needs.\u003C\u002Fp>\n\u003Cp>We work closely with our clients to ensure that we understand their specific requirements and provide a tailored solution that meets their needs. We are always up-to-date with the latest innovations in the industry, including double and triple skin roof lights, which can help with EPC ratings and condensation issues. These new materials and technologies can help our clients to significantly reduce their energy costs, enhance their working environments, and improve their overall sustainability.\u003C\u002Fp>\n\u003Cp>At Cambridge Roof Exchange, we are committed to providing our clients with the best possible service and solutions, and we believe that our expertise in changing roof lights can make a significant difference to the functionality and efficiency of industrial buildings.\u003C\u002Fp>","Draft","2024-12-13T12:29:42.000000Z","2025-01-27T14:23:30.000000Z",{"case_study_id":4,"service_id":130},{"id":134,"alt":15,"path":143,"type":23,"visibility":24,"created_by_id":110,"deleted_at":15,"created_at":144,"updated_at":144,"url":145},"media-files\u002Flights.svg","2025-01-17T22:30:47.000000Z","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Flights.svg",1791284455042]