[{"data":1,"prerenderedAt":141},["ShallowReactive",2],{"caseStudy:warehouse-over-clad":3},{"id":4,"job_description":5,"location":6,"publish_state":7,"spotlight":8,"title":9,"seo_title":9,"seo_meta_description":10,"slug":11,"og_image_id":12,"main_image_id":13,"main_video_id":14,"summary":15,"work_started_at":16,"work_completed_at":17,"customer_id":14,"enquiry_id":14,"deleted_at":14,"created_at":18,"updated_at":19,"customer":14,"enquiry":14,"main_image":20,"main_video":14,"media_files":27,"og_image":102,"services":106},"01jwze6ttt1sf79k3mrr1dwd5p","\u003Cp class=\"MsoNormal\">\u003Cstrong>Client:\u003C\u002Fstrong>\u003Cbr>Iron Mountain\u003Cbr>\u003Cstrong>Location:\u003C\u002Fstrong>\u003Cbr>Swindon, UK\u003Cbr>\u003Cstrong>Building Type:\u003C\u002Fstrong>\u003Cbr>Industrial Warehouse (2580m2)\u003Cbr>\u003Cstrong>Project Timeline:\u003C\u002Fstrong>\u003Cbr>6 Weeks\u003Cbr>\u003Cstrong>System Used:\u003C\u002Fstrong>\u003Cbr>Garland R-MER&reg; CLAD Overclad System\u003C\u002Fp>\n\u003Cdiv class=\"MsoNormal\" style=\"text-align: center;\" align=\"center\">\u003Chr align=\"center\" size=\"0\" width=\"100%\">\u003C\u002Fdiv>\n\u003Cp class=\"MsoNormal\">\u003Cstrong>Background\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">This project was a collaboration with Garland and CBRE. The building is having a complete renovation internally and externally, including the new over-clad roof, wall cladding and complete internal re-fit. Our scope of works was to install a new over-clad system on the roof including new trimline gutters and RWP. The existing metal roof had severe corrosion with paint starting peal causing water ingress internally. Once complete the building will be used as storage for Iron Mountain.&nbsp;\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cstrong>&nbsp;\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cdiv class=\"MsoNormal\" style=\"text-align: center;\" align=\"center\">\u003Chr align=\"center\" size=\"0\" width=\"100%\">\u003C\u002Fdiv>\n\u003Cp class=\"MsoNormal\">\u003Cstrong>Challenges\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cul style=\"margin-top: 0cm;\" type=\"disc\">\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1; tab-stops: list 36.0pt;\">\u003Cstrong>Ageing Metal Roof:\u003C\u002Fstrong> Severe corrosion and water ingress were widespread.\u003C\u002Fli>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1; tab-stops: list 36.0pt;\">\u003Cstrong>Thermal Performance:\u003C\u002Fstrong> Poor insulation was driving excessive heating costs in winter\u003C\u002Fli>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l0 level1 lfo1; tab-stops: list 36.0pt;\">\u003Cstrong>Weather conditions:\u003C\u002Fstrong> Due to the time of year we had constant battles with weather conditions including freezing conditions, rain and wind.\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cdiv class=\"MsoNormal\" style=\"text-align: center;\" align=\"center\">\u003Chr align=\"center\" size=\"0\" width=\"100%\">\u003C\u002Fdiv>\n\u003Cp class=\"MsoNormal\">\u003Cstrong>Solution: Garland Overclad System\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Garland proposed the \u003Cstrong>R-MER&reg; CLAD Overclad System\u003C\u002Fstrong>, which involves fixing a new high-performance metal profile over the existing roof, incorporating insulation and a waterproof membrane. This avoids costly tear-off while improving energy efficiency and durability.\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cstrong>System Components:\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Col style=\"margin-top: 0cm;\" start=\"1\" type=\"1\">\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l2 level1 lfo2; tab-stops: list 36.0pt;\">Spacer bar and bracket system to create a cavity\u003C\u002Fli>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l2 level1 lfo2; tab-stops: list 36.0pt;\">Mineral wool insulation to meet Part L Building Regulations\u003C\u002Fli>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l2 level1 lfo2; tab-stops: list 36.0pt;\">Steel profile sheeting in Plastisol-coated steel\u003C\u002Fli>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l2 level1 lfo2; tab-stops: list 36.0pt;\">High-performance waterproof membrane\u003C\u002Fli>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l2 level1 lfo2; tab-stops: list 36.0pt;\">Continuous ridge and eaves ventilation to prevent condensation\u003C\u002Fli>\n\u003C\u002Fol>\n\u003Cdiv class=\"MsoNormal\" style=\"text-align: center;\" align=\"center\">\u003Chr align=\"center\" size=\"0\" width=\"100%\">\u003C\u002Fdiv>\n\u003Cp class=\"MsoNormal\">\u003Cstrong>Installation Process\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Col style=\"margin-top: 0cm;\" start=\"1\" type=\"1\">\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l1 level1 lfo3; tab-stops: list 36.0pt;\">\u003Cstrong>Survey &amp; Design:\u003C\u002Fstrong>\u003C\u002Fli>\n\u003Cul style=\"margin-top: 0cm;\" type=\"circle\">\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l1 level2 lfo3; tab-stops: list 72.0pt;\">Roof survey using drone\u003C\u002Fli>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l1 level2 lfo3; tab-stops: list 72.0pt;\">Custom design tailored to the roof pitch and layout\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l1 level1 lfo3; tab-stops: list 36.0pt;\">\u003Cstrong>Preparation:\u003C\u002Fstrong>\u003C\u002Fli>\n\u003Cul style=\"margin-top: 0cm;\" type=\"circle\">\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l1 level2 lfo3; tab-stops: list 72.0pt;\">Cover existing roof lights with OSB board\u003C\u002Fli>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l1 level2 lfo3; tab-stops: list 72.0pt;\">Clean existing roof of debris\u003C\u002Fli>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l1 level2 lfo3; tab-stops: list 72.0pt;\">install waterproof membrane\u003C\u002Fli>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l1 level2 lfo3; tab-stops: list 72.0pt;\">install galvanized top hat system for spacer bars to fix to\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l1 level1 lfo3; tab-stops: list 36.0pt;\">\u003Cstrong>Over-cladding:\u003C\u002Fstrong>\u003C\u002Fli>\n\u003Cul style=\"margin-top: 0cm;\" type=\"circle\">\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l1 level2 lfo3; tab-stops: list 72.0pt;\">Fitting of insulation between spacer bars\u003C\u002Fli>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l1 level2 lfo3; tab-stops: list 72.0pt;\">Installation of new metal profile sheets\u003C\u002Fli>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l1 level2 lfo3; tab-stops: list 72.0pt;\">Install ridge\u003C\u002Fli>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l1 level2 lfo3; tab-stops: list 72.0pt;\">Install barge boards\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l1 level1 lfo3; tab-stops: list 36.0pt;\">\u003Cstrong>Final Touches:\u003C\u002Fstrong>\u003C\u002Fli>\n\u003Cul style=\"margin-top: 0cm;\" type=\"circle\">\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l1 level2 lfo3; tab-stops: list 72.0pt;\">Rainwater goods\u003C\u002Fli>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l1 level2 lfo3; tab-stops: list 72.0pt;\">Roof hatch access\u003C\u002Fli>\n\u003Cli class=\"MsoNormal\" style=\"mso-list: l1 level2 lfo3; tab-stops: list 72.0pt;\">Safety line system\u003C\u002Fli>\n\u003C\u002Ful>\n\u003C\u002Fol>\n\u003Cdiv class=\"MsoNormal\" style=\"text-align: center;\" align=\"center\">\u003Chr align=\"center\" size=\"0\" width=\"100%\">\u003C\u002Fdiv>\n\u003Cp class=\"MsoNormal\">\u003Cstrong>Results\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Ctable class=\"MsoNormalTable\" style=\"mso-cellspacing: 1.5pt; mso-yfti-tbllook: 1184;\" border=\"0\" cellpadding=\"0\">\n\u003Cthead>\n\u003Ctr style=\"mso-yfti-irow: 0; mso-yfti-firstrow: yes;\">\n\u003Ctd style=\"padding: .75pt .75pt .75pt .75pt;\">\n\u003Cp class=\"MsoNormal\">\u003Cstrong>Aspect\u003C\u002Fstrong>\u003C\u002Fp>\n\u003C\u002Ftd>\n\u003Ctd style=\"padding: .75pt .75pt .75pt .75pt;\">\n\u003Cp class=\"MsoNormal\">\u003Cstrong>Before\u003C\u002Fstrong>\u003C\u002Fp>\n\u003C\u002Ftd>\n\u003Ctd style=\"padding: .75pt .75pt .75pt .75pt;\">\n\u003Cp class=\"MsoNormal\">\u003Cstrong>After\u003C\u002Fstrong>\u003C\u002Fp>\n\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Fthead>\n\u003Ctbody>\n\u003Ctr style=\"mso-yfti-irow: 1;\">\n\u003Ctd style=\"padding: .75pt .75pt .75pt .75pt;\">\n\u003Cp class=\"MsoNormal\">Leaks\u003C\u002Fp>\n\u003C\u002Ftd>\n\u003Ctd style=\"padding: .75pt .75pt .75pt .75pt;\">\n\u003Cp class=\"MsoNormal\">Frequent\u003C\u002Fp>\n\u003C\u002Ftd>\n\u003Ctd style=\"padding: .75pt .75pt .75pt .75pt;\">\n\u003Cp class=\"MsoNormal\">None reported post-install\u003C\u002Fp>\n\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr style=\"mso-yfti-irow: 2;\">\n\u003Ctd style=\"padding: .75pt .75pt .75pt .75pt;\">\n\u003Cp class=\"MsoNormal\">U-Value\u003C\u002Fp>\n\u003C\u002Ftd>\n\u003Ctd style=\"padding: .75pt .75pt .75pt .75pt;\">\n\u003Cp class=\"MsoNormal\">~1.8 W\u002Fm&sup2;K\u003C\u002Fp>\n\u003C\u002Ftd>\n\u003Ctd style=\"padding: .75pt .75pt .75pt .75pt;\">\n\u003Cp class=\"MsoNormal\">0.25 W\u002Fm&sup2;K\u003C\u002Fp>\n\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr style=\"mso-yfti-irow: 3;\">\n\u003Ctd style=\"padding: .75pt .75pt .75pt .75pt;\">\n\u003Cp class=\"MsoNormal\">Energy Costs\u003C\u002Fp>\n\u003C\u002Ftd>\n\u003Ctd style=\"padding: .75pt .75pt .75pt .75pt;\">\n\u003Cp class=\"MsoNormal\">&pound;5,800\u002Fyear\u003C\u002Fp>\n\u003C\u002Ftd>\n\u003Ctd style=\"padding: .75pt .75pt .75pt .75pt;\">\n\u003Cp class=\"MsoNormal\">&pound;3,200\u002Fyear\u003C\u002Fp>\n\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr style=\"mso-yfti-irow: 4; mso-yfti-lastrow: yes;\">\n\u003Ctd style=\"padding: .75pt .75pt .75pt .75pt;\">\n\u003Cp class=\"MsoNormal\">Downtime\u003C\u002Fp>\n\u003C\u002Ftd>\n\u003Ctd style=\"padding: .75pt .75pt .75pt .75pt;\">\n\u003Cp class=\"MsoNormal\">Risk of shutdown\u003C\u002Fp>\n\u003C\u002Ftd>\n\u003Ctd style=\"padding: .75pt .75pt .75pt .75pt;\">\n\u003Cp class=\"MsoNormal\">0 hours\u003C\u002Fp>\n\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Cdiv class=\"MsoNormal\" style=\"text-align: center;\" align=\"center\">\u003Chr align=\"center\" size=\"0\" width=\"100%\">\u003C\u002Fdiv>\n\u003Cp class=\"MsoNormal\">\u003Cstrong>Conclusion\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The Garland Overclad System offered Iron Mountain a reliable, cost-effective, and sustainable refurbishment alternative to full roof replacement. Its success in this case reinforces the system&rsquo;s value for industrial clients seeking long-term protection with minimal disruption. All in all this was a great project to work on even with severe weather conditions loosing us almost 2 weeks work we still managed to complete on time and to a high workmanship standard. With this project being to Garland spec all Garland reports came back with positive feedback including our high workmanship standard and rate of progression.\u003C\u002Fp>","Swindon","Published",false,"Warehouse Over-Clad","Over-clad of existing metal roof system.","warehouse-over-clad","01jzascncaa0qghvg0j01g7vx0","01jzaskadd2zkn2ngan78w1s93",null,"Over-clad of existing metal roof.","2025-01-17T07:59:00.000000Z","2025-03-05T07:59:00.000000Z","2025-06-05T06:59:41.000000Z","2026-08-03T11:41:02.000000Z",{"id":13,"alt":14,"path":21,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":25,"updated_at":25,"url":26},"media-files\u002FIMG-20250606-WA0000-v2.jpg","Image","Public","01jqeb52hdff1f0bypsy20pczm","2025-07-04T13:21:46.000000Z","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FIMG-20250606-WA0000-v2.jpg",[28,37,45,54,63,71,79,87,94],{"id":29,"alt":30,"path":31,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":32,"updated_at":32,"pivot":33,"url":36},"01jx231cftvjf7hhy2pjt3a7gn","View of building prior to works starting","media-files\u002F6.png","2025-06-06T07:42:11.000000Z",{"case_study_id":4,"media_file_id":29,"id":34,"job_phase":35},"01jx231ckbznhxvg04hhkxy84q","Before","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002F6.png",{"id":38,"alt":39,"path":40,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":41,"updated_at":41,"pivot":42,"url":44},"01jx23501ek234wcrqaxzdc9kt","View of roof showing damaged roof lights, paint pealing and corroded fixings","media-files\u002F11.png","2025-06-06T07:44:09.000000Z",{"case_study_id":4,"media_file_id":38,"id":43,"job_phase":35},"01jx23504rkk087epqt57d2s12","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002F11.png",{"id":46,"alt":47,"path":48,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":49,"updated_at":49,"pivot":50,"url":53},"01jx23p84a5rd631qp1zw608m0","view of insulation being laid out prior to sheets being installed","media-files\u002F20250206_095259.jpg","2025-06-06T07:53:35.000000Z",{"case_study_id":4,"media_file_id":46,"id":51,"job_phase":52},"01jx23p86edkxvks4tj3g801f5","During","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002F20250206_095259.jpg",{"id":55,"alt":56,"path":57,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":58,"updated_at":58,"pivot":59,"url":62},"01jx24k083q0bcx6dgaz768e7g","view of newly installed ridge","media-files\u002FSwindon_1.png","2025-06-06T08:09:17.000000Z",{"case_study_id":4,"media_file_id":55,"id":60,"job_phase":61},"01jx24k0ak6kdrw5q4hr61raht","After","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FSwindon_1.png",{"id":64,"alt":65,"path":66,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":67,"updated_at":67,"pivot":68,"url":70},"01jx24mydv11gvzqd82dx3z2n4","roof complete","media-files\u002FSwindon_3.png","2025-06-06T08:10:20.000000Z",{"case_study_id":4,"media_file_id":64,"id":69,"job_phase":61},"01jx24myga2rbdnd085yh3nr0v","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FSwindon_3.png",{"id":72,"alt":73,"path":74,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":75,"updated_at":75,"pivot":76,"url":78},"01jx24xbkrj7spqx5e5h82e2g0","view from ridge","media-files\u002FSwindon_7.png","2025-06-06T08:14:56.000000Z",{"case_study_id":4,"media_file_id":72,"id":77,"job_phase":61},"01jx24xbnrvxc7ctpaggvpqwj9","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FSwindon_7.png",{"id":80,"alt":81,"path":82,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":83,"updated_at":83,"pivot":84,"url":86},"01jzas6x89aezj59rz203z1jft","View from above","media-files\u002FIMG-20250704-WA0000.jpg","2025-07-04T13:15:00.000000Z",{"case_study_id":4,"media_file_id":80,"id":85,"job_phase":61},"01jzas6xdh6wqssyqbs02e63b1","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FIMG-20250704-WA0000.jpg",{"id":88,"alt":81,"path":89,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":90,"updated_at":90,"pivot":91,"url":93},"01jzas8871c4pvm2eepvrnqaza","media-files\u002FIMG-20250704-WA0001.jpg","2025-07-04T13:15:44.000000Z",{"case_study_id":4,"media_file_id":88,"id":92,"job_phase":61},"01jzas88a7zxhs1k2dk0f8hm95","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FIMG-20250704-WA0001.jpg",{"id":95,"alt":96,"path":97,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":98,"updated_at":98,"pivot":99,"url":101},"01jzas8ym5z3yy7wktk5tvb2ff","View From Above","media-files\u002FIMG-20250704-WA0002.jpg","2025-07-04T13:16:07.000000Z",{"case_study_id":4,"media_file_id":95,"id":100,"job_phase":61},"01jzas8yp6513qjmm4y1bv4qth","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FIMG-20250704-WA0002.jpg",{"id":12,"alt":14,"path":103,"type":22,"visibility":23,"created_by_id":24,"deleted_at":14,"created_at":104,"updated_at":104,"url":105},"media-files\u002FIMG-20250704-WA0000-v2.jpg","2025-07-04T13:18:08.000000Z","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002FIMG-20250704-WA0000-v2.jpg",[107,125],{"id":108,"title":109,"slug":110,"seo_title":109,"seo_meta_description":111,"icon_image_id":112,"og_image_id":113,"main_image_id":114,"description":111,"content":115,"publish_state":116,"deleted_at":14,"created_at":117,"updated_at":118,"pivot":119,"icon_image":120},"01jc64an1f57xtd9fz9xerwp6t","Gutter Refurbishment","gutter-refurbishment","Gutter Refurbishment is crucial to ensure that the building remains in good condition and to avoid any damage caused by leaks.","01jhv77yj05bmbtkh2p8ng7jx0","01jfrwc74hz5034tv8wadxf46d","01jfrwcwwqgkjwxw9jpssr0jr1","\u003Cp>Refurbishing gutters on industrial buildings is crucial to ensure that the building remains in good condition and to avoid any damage caused by leaks. At Cambridge Roof Exchange Ltd, we have extensive experience in this area and can provide a range of solutions to meet the specific needs of your building. There are many systems available on the market that can not only stop leaks but also increase gutter capacity, ensuring that your building can handle heavy rainfall without any issues.\u003C\u002Fp>\n\u003Cp>We understand the importance of providing high-quality solutions that are built to last, which is why we work with leading manufacturers to offer warranties of up to 50 years on our gutter systems. Our team of experienced professionals will work with you to identify any issues with your current gutter system and recommend the best solution based on your specific requirements. With our expertise and commitment to quality, you can trust Cambridge Roof Exchange Ltd to deliver the best results for your industrial building.\u003C\u002Fp>","Draft","2024-11-08T14:54:50.000000Z","2025-01-27T14:23:08.000000Z",{"case_study_id":4,"service_id":108},{"id":112,"alt":14,"path":121,"type":22,"visibility":23,"created_by_id":122,"deleted_at":14,"created_at":123,"updated_at":123,"url":124},"media-files\u002Fgutter-v2.svg","01jf7zhwkt8ra9f0004aszb4r2","2025-01-17T22:48:19.000000Z","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Fgutter-v2.svg",{"id":126,"title":127,"slug":128,"seo_title":127,"seo_meta_description":129,"icon_image_id":130,"og_image_id":131,"main_image_id":132,"description":129,"content":133,"publish_state":7,"deleted_at":14,"created_at":134,"updated_at":135,"pivot":136,"icon_image":137},"01jc65z97wb7axzb9ejsajcznq","Commercial Roofing \u002F Cladding","commercial-roofing-cladding","We are the premier commercial roofing and cladding contractor based in Cambridge.","01jhv6e3j176hepvt1sqt6j8sf","01jfryaqm77b41fk7ccjw4t4cb","01jk58j4xe2af7eyr4r3dyc1m7","\u003Cp>We are the premier Cambridge Commercial Roofing and Cladding contractor. With years of experience in the industry, we specialise in the refurbishment of industrial buildings with an emphasis on asbestos removal and replacement, over cladding projects, and upgrading EPC ratings to meet new government guidelines. Our team has the leading in-house expertise for design, management, customer care, and procurement.\u003C\u002Fp>\n\u003Cfigure class=\"image align-left\">\u003Cimg src=\"https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Fmark-cre-body.png\" alt=\"MARK LANGLEY - MANAGING DIRECTOR\" width=\"711\" height=\"475\">\n\u003Cfigcaption>\u003Cstrong>\u003Cspan style=\"font-size: 8pt;\">MARK LANGLEY - CRE OWNER\u003C\u002Fspan>\u003C\u002Fstrong>\u003C\u002Ffigcaption>\n\u003C\u002Ffigure>\n\u003Cp>&nbsp;\u003C\u002Fp>\n\u003Cp>We are proud to have obtained ISO9001, ISO14001, and ISO45001 accreditations, which highlights our commitment to quality, environmental management, and health and safety. Our accreditations demonstrate our dedication to providing our clients with the highest standards of service possible. We are constantly striving to improve our processes and procedures to ensure that we maintain these high standards.\u003C\u002Fp>\n\u003Cfigure class=\"image\">\u003Cimg src=\"https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Froof-body-v2.png\" alt=\"\" width=\"711\" height=\"471\">\n\u003Cfigcaption>\u003Cspan style=\"font-size: 8pt;\">\u003Ca href=\"..\u002F..\u002F..\u002Fcase-studies\u002Fgreenhill-houses\">GREENHILL HOUSE\u003C\u002Fa> RENOVATION BY CRE\u003C\u002Fspan>\u003C\u002Ffigcaption>\n\u003C\u002Ffigure>\n\u003Cp>&nbsp;\u003C\u002Fp>\n\u003Cp>At Cambridge Roof Exchange Ltd, we have the expertise to deal with projects from the initial enquiry through to completion. We handle all relevant authorities to ensure compliance, including building control and structural compliance. Our team is experienced in dealing with these issues and can provide the necessary advice and support to help our clients navigate the complex regulatory landscape.\u003C\u002Fp>\n\u003Cp>All of our staff have a wealth of experience in the industrial roofing and cladding sector, which allows us to provide not only great advice but also recommend the best solutions for your projects. We have worked on many large-scale projects both nationally and internationally, which has given us the experience and expertise to handle complex projects of any size and scope.\u003C\u002Fp>\n\u003Cfigure class=\"image\">\u003Cimg src=\"https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Fworkers-body.png\" alt=\"\" width=\"711\" height=\"475\">\n\u003Cfigcaption>\u003Cstrong>\u003Cspan style=\"font-size: 8pt;\">WE ARE FULLY CERTIFIED PROFESSIONALS WITH YEARS OF EXPERIENCE ONSITE.&nbsp;\u003C\u002Fspan>\u003C\u002Fstrong>\u003C\u002Ffigcaption>\n\u003C\u002Ffigure>\n\u003Cp>At Cambridge Roof Exchange Ltd, we believe in delivering high-quality services that exceed our clients' expectations. We are committed to providing a safe and healthy work environment for our employees and clients and take health and safety very seriously. Our team is dedicated to ensuring that health and safety is at the forefront of everything we do, and we have a dedicated Health and Safety Manager who is accredited to the highest levels.\u003C\u002Fp>","2024-11-08T15:23:35.000000Z","2025-02-03T06:39:30.000000Z",{"case_study_id":4,"service_id":126},{"id":130,"alt":14,"path":138,"type":22,"visibility":23,"created_by_id":122,"deleted_at":14,"created_at":139,"updated_at":139,"url":140},"media-files\u002Froofing.svg","2025-01-17T22:34:12.000000Z","https:\u002F\u002Fcrex.lon1.cdn.digitaloceanspaces.com\u002Fmedia-files\u002Froofing.svg",1785757310694]