Case Study:

Units 20A & B

Loading images...
Loading caption...

Mildenhall

6 week project, 2025

Asbestos Removal
Commercial Roofing / Cladding
Industrial Roof Lights

Asbestos Removal, Commercial Roofing / Cladding and Industrial Roof Lights

This project was a collaboration with Garland for West Suffolk Council. Unit 20A was an empty building previously a charity shop, Unit 20B was occupied of which we built a great relationship with the occupier to make the process easy for them as well as not disrupting their business. On this project as well as a replacement roof we also install Garland spec wall cladding along with some brickwork repairs and new PVC doors and windows.

West Suffolk Council couldn’t help but praise our workmanship on this project along with Garland. We had twice weekly inspection reports from Garland on this project all of which came back positive.

Due to the purlins being concrete we designed a galvanized system to be installed on the concrete purlin with specially designed SFS fixings, this not only strengthened the purlins but also gave us a strong fixing point for our composite sheets all backed up with technical analysis from a trained professional to reassure WSC. We also installed a new trimline gutter to make the building look neat.

As with all projects detailing work and flashings is very important to make the job look neat. Our experienced operatives once again did not let us down with this, both WSC and Garland commented on how neat our flashings and detail work was on this project.

All in all, this was a great project to work on with everyone involved very pleased with the outcome and we look forward to working with all involved again.