Get in touch

Cambridge Roof Exchange Ltd

Unit 2 Barton Court, Comberton, Cambridge CB23 7BU. Survey-led industrial roof refurbishment across the UK.

01 / About CRE

Sixty years of industrial roof refurbishment.

Refurbishment, overcladding and asbestos removal. Never new-build, always live-site. Cambridge-based, working across the UK.

Read more →

02 / What we do

A comprehensive range of refurbishment-led services.

Commercial roofing & cladding, asbestos removal, overcladding, thermal upgrades, gutter & rainwater systems, rooflights & ventilation, building surveys.

Read more →

03 / Selected work

Recent industrial refurbishments.

Live-site programmes delivered without taking facilities offline.

Read more →

04 / Blog

Make the right call on an ageing roof.

Guides for owners of older factories and warehouses: asbestos roofs, repair versus replacement, and planning insulation and solar together.

Read more →

05 / Compliance

Accreditations that mean something on site.

NFRC member, SafeContractor approved, CITB registered, ISO 9001 / 14001 / 45001 certified.

Read more →

06 / Get in touch

Cambridge Roof Exchange Ltd.

223 Barton Court, Comberton, Cambridge, CB23 7BU. 01223 782 085. support@cre.me.uk.

Read more →

Cambridge Roof Exchange Ltd

223 Barton Court, Comberton, Cambridge, CB23 7BU

01223 782 085support@cre.me.uk
Case Study:

Warehouse Over-Clad

Loading images...
Loading caption...

Swindon

7 week project, 2025

Gutter Refurbishment
Commercial Roofing / Cladding

Gutter Refurbishment and Commercial Roofing / Cladding

Location:
Swindon, UK
Building Type:
Industrial Warehouse (2580m2)
Project Timeline:
6 Weeks
System Used:
Garland R-MER® CLAD Overclad System


Background

This project was a collaboration with Garland and CBRE. The building is having a complete renovation internally and externally, including the new over-clad roof, wall cladding and complete internal re-fit. Our scope of works was to install a new over-clad system on the roof including new trimline gutters and RWP. The existing metal roof had severe corrosion with paint starting peal causing water ingress internally.

 


Challenges

  • Ageing Metal Roof: Severe corrosion and water ingress were widespread.
  • Thermal Performance: Poor insulation was driving excessive heating costs in winter
  • Weather conditions: Due to the time of year we had constant battles with weather conditions including freezing conditions, rain and wind.

Solution: Garland Overclad System

Garland proposed the R-MER® CLAD Overclad System, which involves fixing a new high-performance metal profile over the existing roof, incorporating insulation and a waterproof membrane. This avoids costly tear-off while improving energy efficiency and durability.

System Components:

  1. Spacer bar and bracket system to create a cavity
  2. Mineral wool insulation to meet Part L Building Regulations
  3. Steel profile sheeting in Plastisol-coated steel
  4. High-performance waterproof membrane
  5. Continuous ridge and eaves ventilation to prevent condensation

Installation Process

  1. Survey & Design:
    • Roof survey using drone
    • Custom design tailored to the roof pitch and layout
  2. Preparation:
    • Cover existing roof lights with OSB board
    • Clean existing roof of debris
    • install waterproof membrane
    • install galvanized top hat system for spacer bars to fix to
  3. Over-cladding:
    • Fitting of insulation between spacer bars
    • Installation of new metal profile sheets
    • Install ridge
    • Install barge boards
  4. Final Touches:
    • Rainwater goods
    • Roof hatch access
    • Safety line system

Results

Aspect

Before

After

Leaks

Frequent

None reported post-install

U-Value

~1.8 W/m²K

0.25 W/m²K

Energy Costs

£5,800/year

£3,200/year

Downtime

Risk of shutdown

0 hours


Conclusion

The Garland Overclad System offered Iron Mountain a reliable, cost-effective, and sustainable refurbishment alternative to full roof replacement. Its success in this case reinforces the system’s value for industrial clients seeking long-term protection with minimal disruption. All in all this was a great project to work on even with severe weather conditions loosing us almost 2 weeks work we still managed to complete on time and to a high workmanship standard. With this project being to Garland spec all Garland reports came back with positive feedback including our high workmanship standard and rate of progression.