Get in touch
Cambridge Roof Exchange Ltd
Unit 2 Barton Court, Comberton, Cambridge CB23 7BU. Survey-led industrial roof refurbishment across the UK.
3 week project, Cambridge
We were tasked with designing, supplying and fitting the “outer shell” which was to be 3” black plastisol coated sinusoidal sheeting.
13 week project, St. Neots
This large-scale 5000 m² warehouse refurbishment project based in Saint Neots is the perfect example of what CRE specialise in.
7 week project, Swindon
Over-clad of existing metal roof.
5 week project, Cambridge
This was a commercial roof overclad.
12 week project, Haverhill
Installation of a new 230mm built-up roof system over the existing asbestos roof and safely remove the old asbestos parapet wall, installing a new cladded parapet.
16 week project, Luton
Asbestos strip and re-sheet of roof and new wall cladding installed.
14 week project, London
Wenzels approached us with a clear and concise request: “We would like to install solar panels on our roof.”
6 week project, Mildenhall
Garland spec asbestos strip and composite sheet installation
5 week project, St Neots
Phases asbestos roof replacement in St Neots
11 week project, Braintree
The safe removal and replacement of an ageing roof in Braintree.
9 week project, Bury St. Edmunds
Full asbestos roof replacement for SRS Aromatics.
14 week project, Wales
Full removal of the aged existing roof, replacement of compromised purlins and installation of Tata Steel Trisomet® composite panels. Delivered to the Tata Steel Platinum Plus specification system.
2 week project, Waterbeach
A complete commercial roof overclad delivering improved thermal performance, weather protection and long-term durability.
12 week project, Staines-upon-Thames
CRE renovated the building before a new lease by ALDI and Lok'n Store.
35 week project, Norfolk
A very interesting and challenging project transforming former cattle feed barns to Three, high end residential units.